20.5 C
New York
Thursday, June 18, 2026

Tag: wind

Aker Solutions ASA: Second-quarter and half-year results 2025

OSLO, Norway, July 11, 2025 /PRNewswire/ -- Aker Solutions delivered solid financial performance in the second quarter and in the first half of 2025. Several...

Clearway Energy, Inc. to Report Second Quarter 2025 Financial Results on August 5, 2025

PRINCETON, N.J., July 10, 2025 (GLOBE NEWSWIRE) -- Clearway Energy, Inc. (NYSE: CWEN, CWEN.A) plans to report Second Quarter 2025 financial results on Tuesday, August 5, 2025. Management will present the results during a conference call and webcast at 5:00 p.m. Eastern.

Aquila Introduces the 36 Molokai: Proven Performance in a Purpose-Built Fishing Platform

New catamaran brings award-winning Molokai design philosophy to 36 feet of fishing-focused engineering CLEARWATER, Fla., July 10, 2025 /PRNewswire/ -- Aquila today announced the launch...

SolarBank Issues Update on Strategic Positioning Amid Shifting U.S. and Canadian Policy Landscape

TORONTO, July 10, 2025 /CNW/ - SolarBank Corporation (Cboe CA: SUNN) (NASDAQ: SUUN) ("SolarBank" or the "Company"), a leading North American developer, owner, and operator of...

Envision Delivers On World’s Largest Green Hydrogen And Ammonia Plant With Off-Grid Renewable System

A milestone in the global energy transition and the future of clean industrial fuel CHIFENG, China, July 10, 2025 /PRNewswire/ -- Envision, a global leader...

Envision Delivers On World’s Largest Green Hydrogen And Ammonia Plant With Off-Grid Renewable System

A milestone in the global energy transition and the future of clean industrial fuel CHIFENG, China, July 10, 2025 /PRNewswire/ -- Envision, a global leader...

XPLR INVESTOR ALERT: Robbins Geller Rudman & Dowd LLP Announces that XPLR Infrastructure, LP f/k/a NextEra Energy Partners, LP Investors with Substantial Losses Have...

SAN DIEGO, July 09, 2025 (GLOBE NEWSWIRE) -- Robbins Geller Rudman & Dowd LLP announces that the XPLR Infrastructure class action lawsuit seeks to represent purchasers or acquirers of XPLR Infrastructure, LP f/k/a NextEra Energy Partners, LP (NYSE: XIFR) securities between September 27, 2023 and January 27, 2025, inclusive (the “Class Period”). Captioned Alvrus v. XPLR Infrastructure, LP f/k/a NextEra Energy Partners, LP, No. 25-cv-01755 (S.D. Cal.), the XPLR Infrastructure class action lawsuit charges XPLR Infrastructure, NextEra Energy, Inc., and certain of XPLR Infrastructure’s top former executives with violations of the Securities Exchange Act of 1934.

Find Georgia’s hidden gems for summer recreation at Georgia Power’s lakes and campgrounds

Company highlights "SPLASH" guidelines and electrical tips for safer summer funCampground reservation system makes booking sites easier ATLANTA, July 9, 2025 /PRNewswire/ -- With the...

Voltalia SA: Total number of shares and voting rights in the share capital as of June 30, 2025 

Total number of shares and voting rights in the share capital as of June 30, 2025 
(Articles L. 233-8 (II) of the French Commercial Code and 223-16 of the General Regulations of the French Financial Markets Authority) 

Voltalia SA : Nombre total de droits de vote et d’actions composant le capital en date du 30 juin 2025

Nombre total de droits de vote et d’actions composant le capital en date du 30 juin 2025
(Art. L. 233-8 (II) du Code de Commerce et Art. 223-16 du Règlement Général de l’AMF)

SINEXCEL and Wasion Energy Power Up Landmark Energy Storage Project in Central America

CARTAGO, Costa Rica, July 9, 2025 /PRNewswire/ -- The Coopesantos Wind Power Energy Storage System, jointly developed by SINEXCEL (300693.SZ) and Wasion Energy, has officially...

FIU study points the way to building mental toughness and enjoying exercise

MIAMI, July 8, 2025 /PRNewswire/ -- Struggling to start a workout routine or stick with one? New research offers a surprising insight: your brain, not...

PS Miner announces rapid progress in its AI cloud mining infrastructure after raising $350 million in Series B funding

London, UK, July 08, 2025 (GLOBE NEWSWIRE) -- PS Miner, a UK cloud mining platform headquartered in Southwark, London, was founded in 2019. On July 1, 2025, it announced the successful completion of its Series B financing, receiving $350 million to support the integration of artificial intelligence technology into its cloud mining business. This round of financing was participated by several investment institutions with expertise in blockchain and sustainable technology.
The company said the newly raised funds will be used to enhance its global network of renewable energy data centers and develop artificial intelligence mining systems designed to improve operational efficiency. These systems are designed to dynamically manage computing resources, predict optimal mining intervals, and reduce overall energy consumption, thereby increasing block verification success rates and operational stability.
PS Miner currently operates more than 50 data centers in multiple countries. These facilities are powered by renewable energy such as wind and solar energy, in line with the company's environmentally sustainable mining strategy. The platform serves more than 7 million users in more than 180 countries and regions.
Cloud Mining Overview
Cloud mining allows users to access cryptocurrency mining capabilities by renting computing power from a service provider without having to purchase and maintain physical hardware. This model provides an alternative to traditional mining, which usually requires a lot of capital investment and technical expertise.
Open the website: psminer.com, and you can get a mining experience contract worth $12 after registration.
PS Miner supports a variety of digital assets, including BTC, ETH, DOGE, USDT, USDC, LTC, XRP, SOL and BCH. The mining business is fully managed by the company, including hardware maintenance and infrastructure operations.
Integration of AI
Integrating AI into PS Miner’s cloud mining framework aims to optimize resource allocation and performance in real time. This approach is expected to reduce power consumption in renewable energy centers and improve system responsiveness.
The company has stated that it plans to expand its green data center layout in Europe, North America and Asia. These centers are expected to use wind and hydroelectric power to provide low-cost and sustainable mining capacity.
Mining Contract Structure
PS Miner offers a variety of cloud mining contract options. These contracts vary in terms of duration and computing power allocation. After the contract is activated, mining income is settled on a daily basis, and the contract principal is returned when the contract expires.
The existing contract levels include terms of 1 to 60 days, and are adjusted accordingly based on the scale of calculations and expected net income. For more details on cloud mining contracts, please visit: https://psminer.com/project
Here are some of the contract displays:

BRĒZ THC Drinks Update: 2025 Launch Expands Access to Legal Microdosed THC Beverage Line

In this 2025 product availability update, BRĒZ shares how its legal microdosed THC drinks are redefining the fast-growing functional beverage space—offering adults new access to non-alcoholic, hemp-derived cannabis tonics aligned with the search for the best THC drink alternatives.
In this 2025 product availability update, BRĒZ shares how its legal microdosed THC drinks are redefining the fast-growing functional beverage space—offering adults new access to non-alcoholic, hemp-derived cannabis tonics aligned with the search for the best THC drink alternatives.

- A word from our sponsors -

spot_img

Newsletter Signup

Name(Required)
Email(Required)
Privacy(Required)
This field is for validation purposes and should be left unchanged.
HomeTagsWind