Highlights:
Rehabilitation of the El Bagre floatation circuit is complete, and full production throughput has resumed.Construction of the additional leach tank at El Bagre Mill...
Highlights include the following drill intercepts:
RVICDDH-24-032 1.7 m at 9.2g/t Au incl. 0.6 m at 18.8g/t AuRVICDDH-24-034 2.1 m at 11.9g/t Au incl. 0.65...