18.3 C
New York
Monday, June 8, 2026

Tag: power consumption

12 Inch Wafer Foundry Market to Hit USD 265.3 Billion by 2031, Driven by AI and EV Chip Demand | Valuates Reports

BANGALORE, India, July 10, 2025 /PRNewswire/ -- 12 Inch Wafer Foundry Market is Segmented by Type (Cutting-Edge (3/5/7nm), 10/14/16/20/28nm, 40/45/65/90nm), by Application (Advanced Logic...

12 Inch Wafer Foundry Market to Hit USD 265.3 Billion by 2031, Driven by AI and EV Chip Demand | Valuates Reports

BANGALORE, India, July 10, 2025 /PRNewswire/ -- 12 Inch Wafer Foundry Market is Segmented by Type (Cutting-Edge (3/5/7nm), 10/14/16/20/28nm, 40/45/65/90nm), by Application (Advanced Logic...

AI RAN to Top $10 Billion by 2029, According to Dell’Oro Group

D-RAN, Single-Purpose, and 5G to Shape AI RAN Market REDWOOD CITY, Calif., July 10, 2025 /PRNewswire/ -- According to a brand-new AI RAN Advanced Research...

TCL CSOT Display Technology Sets New Trend in Foldables with Lenovo moto razr 60 Series

SHANGHAI, July 10, 2025 /PRNewswire/ -- TCL CSOT, a global leader in advanced display technologies, participated in the Lenovo Tianxi AI Ecosystem Spring Launch...

Trina Storage Accelerates Energy Storage Growth Across Asia-Pacific with 2.4 GWh of Deployments Underway

SINGAPORE, July 10, 2025 /PRNewswire/ -- Trina Storage, the energy storage division of global solar leader Trinasolar, has reached a significant milestone with more than...

Samsung Galaxy Z Flip7: A Pocket-Sized AI Powerhouse with a New Edge-To-Edge FlexWindow

Compact in size, bold in capability – Galaxy Z Flip7 redefines the flip phone experience SYDNEY, July 10, 2025 /PRNewswire/ -- Samsung Electronics Co., Ltd. today...

PS Miner announces rapid progress in its AI cloud mining infrastructure after raising $350 million in Series B funding

London, UK, July 08, 2025 (GLOBE NEWSWIRE) -- PS Miner, a UK cloud mining platform headquartered in Southwark, London, was founded in 2019. On July 1, 2025, it announced the successful completion of its Series B financing, receiving $350 million to support the integration of artificial intelligence technology into its cloud mining business. This round of financing was participated by several investment institutions with expertise in blockchain and sustainable technology.
The company said the newly raised funds will be used to enhance its global network of renewable energy data centers and develop artificial intelligence mining systems designed to improve operational efficiency. These systems are designed to dynamically manage computing resources, predict optimal mining intervals, and reduce overall energy consumption, thereby increasing block verification success rates and operational stability.
PS Miner currently operates more than 50 data centers in multiple countries. These facilities are powered by renewable energy such as wind and solar energy, in line with the company's environmentally sustainable mining strategy. The platform serves more than 7 million users in more than 180 countries and regions.
Cloud Mining Overview
Cloud mining allows users to access cryptocurrency mining capabilities by renting computing power from a service provider without having to purchase and maintain physical hardware. This model provides an alternative to traditional mining, which usually requires a lot of capital investment and technical expertise.
Open the website: psminer.com, and you can get a mining experience contract worth $12 after registration.
PS Miner supports a variety of digital assets, including BTC, ETH, DOGE, USDT, USDC, LTC, XRP, SOL and BCH. The mining business is fully managed by the company, including hardware maintenance and infrastructure operations.
Integration of AI
Integrating AI into PS Miner’s cloud mining framework aims to optimize resource allocation and performance in real time. This approach is expected to reduce power consumption in renewable energy centers and improve system responsiveness.
The company has stated that it plans to expand its green data center layout in Europe, North America and Asia. These centers are expected to use wind and hydroelectric power to provide low-cost and sustainable mining capacity.
Mining Contract Structure
PS Miner offers a variety of cloud mining contract options. These contracts vary in terms of duration and computing power allocation. After the contract is activated, mining income is settled on a daily basis, and the contract principal is returned when the contract expires.
The existing contract levels include terms of 1 to 60 days, and are adjusted accordingly based on the scale of calculations and expected net income. For more details on cloud mining contracts, please visit: https://psminer.com/project
Here are some of the contract displays:

BTQ Launches World’s First Quantum Proof-of-Work Simulator, Delivering the First Commercial Demonstration of Quantum Advantage in Blockchain Consensus

BTQ Quantum Proof-of-Work (QPoW) Simulator offers a live, interactive platform to demonstrate quantum-native consensus mechanisms that remain compatible with existing blockchain infrastructure.QPoW delivers measurable...

BTQ Launches World’s First Quantum Proof-of-Work Simulator, Delivering the First Commercial Demonstration of Quantum Advantage in Blockchain Consensus

BTQ Quantum Proof-of-Work (QPoW) Simulator offers a live, interactive platform to demonstrate quantum-native consensus mechanisms that remain compatible with existing blockchain infrastructure.QPoW delivers measurable...

Advantech Unveils Next-Generation Edge AI Compute Solutions Powered by Qualcomm Snapdragon X Elite

TAIPEI, July 7, 2025 /PRNewswire/ -- Advantech is proud to introduce its latest suite of high-performance edge AI compute solutions powered by the Snapdragon®...

USI Delivers Full-System JDM Design Services for Level 10 AI Edge Server Platform

SHANGHAI, July 3, 2025 /PRNewswire/ -- USI, Universal Scientific Industrial (Shanghai) Co., Ltd., a global leader in electronic design and manufacturing services, announced the successful...

New Open Market Pattern: Strategic Opportunities in the XRP and DRML Mining Machine Alliance

XRP and DRML: Pioneering a New Crypto Mining Era
XRP and DRML: Pioneering a New Crypto Mining Era

Narada’s Center L Ultra 6.25MWh Liquid-Cooled Energy Storage System Ready for Global Delivery

HANGZHOU, China, July 2, 2025 /PRNewswire/ -- Recently, Narada has announced the upcoming mass production of its Center L Ultra liquid-cooled energy storage system, once...

Narada’s Center L Ultra 6.25MWh Liquid-Cooled Energy Storage System Ready for Global Delivery

HANGZHOU, China, July 2, 2025 /PRNewswire/ -- Recently, Narada has announced the upcoming mass production of its Center L Ultra liquid-cooled energy storage system, once...

- A word from our sponsors -

spot_img

Newsletter Signup

Name(Required)
Email(Required)
Privacy(Required)
This field is for validation purposes and should be left unchanged.
HomeTagsPower consumption